Bore Water Supply, Water Transfer Infrastructure, Design and Construct, Remote & Regional Works, Pump Station Works

Vince Galea
The project comprises of a water infrastructure to design and construct over15km of PVC Ring Mains consisting in sizes from 300mm down 200mm linked to 5 Irrigation bores and one 50megalitre storage dam to irrigate Vegetable and Lucerne crops from a 520ha property
This project was started back 2000 in consultation with Vince Galea and has been developed over the last 20 years as the farm expanded to the full acreage being fully irrigated by the end of 2021. Galea Fresh Produce are a major supply of fresh fruit and vegetables to the Sydney Markets and have been a long-standing client of TI for the past 25 years.