
Start date:
December, 2020
-
Completion date:
June, 2021
Cowra NSW
Cowra Shire Council
$750k
Water supply Infrastructure, Remote & Regional Works, Pump Station Works

Mick Tedeschi
Project Manager

Philippa Childs
Project Manager
Cowra Shire Council required a Design and Construct upgrade of the existing Lachlan River Low lift pump station which houses three pumps in a Wet Well connected to an internal manifold that directs water via a pipe out of the well up to a higher lift pump station holding tank ,the existing pumps are well past there life span with one pump not functioning at all and the second pump constantly breaking down this leaves the town very vulnerable to supply failure, as part of the upgrade council has requested that the river inlet pump station below the Low Lift Wet Well be upgraded at the same time as a permeant back up to the existing Low lift pump station as part of this project this would give council a fully functioning system while the major upgrade to the Low Lift Pump Station was carried out and would eventually supply council with 2 individual supply systems from the Lachlan river. This project aims to secure the water supply delivered from the low lift pump station to the high lift pump station and allow the flow rate to be scaled down and up with variable speed drive pumps with flow fluctuation from 30l/s up to 280l/s and to create redundancy with at least one extra pump from the low lift pump station to the high lift pump station as well as the two river lift pumps as back up.